Plate and frame filter equipment installation and handover process
- 2020-05-31-

Plate and frame filter equipment installation and handover process


After the plate and frame filter equipment is delivered to the enterprise, it must be installed, debugged, and the final inspection work must be done.


\u003Ci>1.\u003C\/i> \u003Cb>1.\u003C\/b>\u003Ci>檢驗(yàn)移送程序\u003C\/i>\u003Cb>Check transfer procedure\u003C\/b>


⑴Experience inspection, device debugging


⑵ make device debugging records


(3) Judgment and related personnel visa together


⑷ Transfer the equipment handling department for equipment numbering, and establish ledger and files


⑸The financial department handles the procedures for transferring into fixed assets


⑹ Delivery and production application


After the filter press indicates that the equipment has been overhauled or technically transformed, the inspection and accounting procedures must also be processed. The relevant technical documents, drawings and accounting records should be stored in the equipment files.


1. Equipment unpacking inspection


After the new equipment enters the factory, the equipment department and the operating unit will participate in the unpacking inspection. The contents are: whether the whole machine is in good condition, whether the attached accessories, and whether the technical documents are consistent with the packing list. After the inspection, fill in the equipment unpacking inspection list. , and transferred to the operating unit for safekeeping. The relevant problems found in the inspection and inspection shall be handled harmoniously by the equipment department.


2, equipment


The installation work of the plate and frame filter is carried out by the equipment department. During this period, the foundation construction is carried out by the infrastructure department. If the operating unit has the ability to install it, it will be installed by the unit; if there is no ability to install, the operator will be arranged by the equipment department to complete the installation.


3, equipment transfer


After the equipment installation of the filter press is completed, the equipment department, together with the operating unit, the infrastructure department, the safety technology and environmental protection department and the relevant device construction units, shall conduct inspection and test runs according to the specifications, and transfer the random accessories and tools. After passing the inspection, the relevant departments and units shall sign And fill in the transfer production inspection form, deliver it for production use, at the same time, register and serialize at the equipment tool; record it in the finance department and the cost department. All settlement costs are included in fixed assets for processing.

Related News



南京推出公积金全家桶政策助力买房 | 美康粉黛天选代言人林一| 疑似一种新病毒在俄罗斯蔓延| 泰高空走廊被震断男子奋力跳向对面 | 韩国庄仕洋| 疑似沈月亚洲最美面孔脱敏训练| 房琪 彭小苒| 李现的微博逐渐奇怪| 山姆客服称水果中吃出虫是正常情况 | 在单位上班一定要沉得住气| 马龙说全运会后还想参加比赛| 陈昊宇陈丽君四公帮唱| 4层及以上住宅设电梯| 愚人节文案| 黄子韬徐艺洋睡觉前要对暗号| 朴成训 来财| 心理师锐评赵露思新综艺| 乌尔善发文| 好房子的新标准来了| 梁洁造型师| 金秀贤公开录音证据| 男子赠妻子闺蜜7万被判全额返还加利息| 沉浸式感受广西三月三| 金秀贤和未成年金赛纶约会视频 | 4层及以上住宅设电梯| 好房子的新标准来了| 缅甸男子求助中国救援队探测出生命10元盒饭姐喊话浪费顾客一辈子别来 | 在单位上班一定要沉得住气河南一枯井发现近百名烈士遗骸 | 王曼昱小岱FocusStar四月刊预告| 房琪 彭小苒| 李昀锐好标准的体育生下楼梯 | 为什么每年都会怀念张国荣| 微博游戏动漫展| 澳门世界杯倒计时两周| 日本特大地震若发生或致近30万人死亡| newjeans是高层内斗的牺牲品吗| 男子发现打工养了7年的女儿非亲生| 乘风2025最新排名| 入室抢婴案奶奶因自责12年独自过春节| 10元盒饭姐喊话浪费顾客一辈子别来 | 赵雅芝儿子|